This 1/2 bathroom was a hot mess even before we started the demolition!
odd small cabinets over the small shower. It was so small, Caleb could lean his head onto the wall in front of him while on the toilet.
And the door would open into the bathroom hitting the small sink/cabinet. However, you could not use the sink or cabinets until you went...
inside the bathroom and closed the door.
So it was time for a change!
Demolition time! Get down to the bare bones!
Installing a new shower.
Caleb's making sure the awkward entrance to the attic, is sealed off properly and attractively while providing proper ventilation.
Once the plumbing is set up properly, the shower can be installed.
Next came the shiplap walls and lighting.
And with several coats of paint, it's just about done.